Home About · Testimonials · Guides Modules · 1 Bed Homes · 2 Bed Homes · 3 Bed Homes · 4 Bed Homes · Garden Rooms · House Extensions Prices Areas Specs Included Process Gallery Contact
close
Don Modular Home side elevation — full-height windows and standing-seam roof

Guide · checked 18 November 2026

Mobile home or modular home: the Irish rules

They sound alike and are sold side by side, but in Irish law they are different things. A mobile home is a caravan: built on a chassis, designed to move, and not a house. A modular home is a house that happens to be built in a factory. That one distinction decides planning, building regulations, finance and how long the thing will last.

The short version

Living in one needs permission

A mobile home used as a dwelling needs planning permission almost everywhere outside a licensed park.

No 2026 exemption

The new garden-home rule excludes caravans and mobile homes by name.

Different job

A mobile home is temporary or holiday accommodation; a modular home is a permanent house.

Planning first

Do you need planning permission for a mobile home?

If you are going to live in it, yes — in practice almost always. Placing a mobile home on land and using it as a dwelling is development, and it is not exempt, whether the land is a field you own, a site you are about to build on, or your own back garden.

In a garden. The exempted-development rules allow a caravan to be kept or stored within the grounds of a house, subject to conditions — but storing one and living in one are different things, and planning authorities have consistently treated a caravan used for habitation in a garden as needing permission.

The 2026 garden-home exemption does not help. The new Class 3A allows a 32–45 m² home in a rear garden on a notification, but its conditions say the structure must not be temporary in nature, and name caravans and mobile homes as examples of what is excluded.

While you build. Living in a mobile home on site during a house build is common, but it is not automatic: it is usually dealt with through the planning permission for the house or a temporary permission. Ask the council before the caravan arrives, not after.

Where a mobile home is straightforward

  • check_circleOn a licensed holiday or residential park — the park holds the planning permission and the site licence; you buy or rent a pitch under its agreement.
  • check_circleStored, not lived in — kept in the grounds of your house between trips, within the conditions of the exemption.
  • check_circleWith a temporary permission — for a fixed period — for example during construction — where the council has agreed it.
  • check_circleNever by waiting — the seven-year limit on enforcement does not make an unauthorised dwelling authorised; it stays unauthorised when you sell or apply for anything else.

The full conditions, with sources, are in our planning permission guide. Your planning authority applies them to your site.

Side by side

Mobile home and modular home, compared

The differences follow from what each one is built to be. Neither is a worse version of the other; they are answers to different questions.

Mobile homeModular home (ours)
What it is in lawA caravan — a structure designed to be moved, on a chassis.A house — a permanent dwelling on foundations.
Built toCaravan standards (typically EN 1647 for holiday homes or BS 3632 for residential park homes), not the Building Regulations.The Building Regulations for a new dwelling, with a Commencement Notice and sign-off.
PlanningPermission needed to live in one outside a licensed park; cannot use the 2026 garden-home exemption.Same rules as any house; a 32–45 m² home in your own rear garden can qualify for the 2026 exemption.
FoundationsSits on its chassis, supported on blocks or stands.Fixed to foundations prepared for the site.
Insulation and running costsVaries by standard and age; holiday-grade homes are not designed for year-round living.200 mm insulation, wall U-value around 0.18 W/m²K, underfloor heating and air conditioning.
Lifespan and valueA depreciating asset, like a vehicle; parks often limit the age of homes on their pitches.Treated as a building; its life is set by structure, foundations and maintenance.
Finance and insuranceGenerally not mortgageable; financed and insured as a caravan.On permanent foundations with planning and building control in order, treated as a house — confirm with your lender.
Local Property TaxNot liable: Revenue leaves out mobile homes and any structure not permanently attached to the ground.Liable like any house once it is lived in or ready to live in. See LPT on a modular home.
Cost to buyLower, often much lower, especially second-hand.€2,400 per m² fully fitted; from €60,480.

The modular column describes the Don Modular Home specification. The mobile home column describes the category in general; individual models and parks differ.

Straight answer

Which one suits what you need

A mobile home is the right answer when…

  • ✓You want a holiday home on a licensed park, and the park's terms suit you.
  • ✓You need somewhere to live for a fixed period while a house is built, and the council has agreed it.
  • ✓The budget is small and the need is temporary.
  • ✓You may want to move it or sell it on in a few years.

A modular home is the right answer when…

  • ✓It is going to be someone's permanent home.
  • ✓It is going in your own garden for a family member, where the 2026 exemption may apply.
  • ✓You need it to stand up to planning, building control, a lender and an insurer as a house.
  • ✓You want it warm in January without thinking about it.

Cost

Cheaper to buy is not the same as cheaper to live in

A mobile home costs far less to buy than a modular home, and a second-hand one less again. If the need is temporary, that is the end of the argument, and it should be.

As a permanent home the sums change. A mobile home loses value as it ages, is usually financed and insured as a caravan rather than as property, costs more to keep warm through an Irish winter, and — outside a licensed park — may not be lawful to live in at all. A home you cannot get permission for is not cheap at any price.

A modular home costs more because it is a house: ours is €2,400 per m² fully fitted, from €60,480 for a 25.2 m² one-bedroom home to €132,480 for a 55.2 m² two-bedroom home, with foundations, delivery and installation quoted after a site assessment. The full price guide covers every size.

Questions

Mobile homes and modular homes — FAQ

Do you need planning permission for a mobile home in Ireland?add

To live in one, almost always yes. Placing a mobile home on land and using it as a dwelling needs planning permission unless it is on a licensed park that already has it. A caravan can be kept or stored in the grounds of a house under an exemption, subject to conditions, but that does not cover living in it.

Can I put a mobile home in my garden in Ireland?add

You can generally store a caravan in the grounds of your house, subject to conditions. Living in a mobile home in the garden is different: it needs planning permission, and the 2026 exemption for a 32–45 m² garden home specifically excludes caravans and mobile homes. A permanent modular home may qualify for that exemption where a mobile home cannot.

What is the 10-year rule for mobile homes in Ireland?add

There is no ten-year rule in the planning regulations. The phrase usually refers to holiday parks, many of which limit the age of homes allowed on their pitches under their own licence agreements — check the park's terms. It is sometimes confused with the seven-year limit on planning enforcement, which does not make an unauthorised mobile home authorised.

Is a modular home the same as a mobile home?add

No. A mobile home is a caravan on a chassis, built to caravan standards and designed to be moved. A modular home is a permanent house on foundations, built in factory sections to the Building Regulations. The law, lenders and insurers treat the two differently.

Can I live in a mobile home while building a house?add

Often, but not automatically. It is usually covered by the planning permission for the house or by a temporary permission, for the duration of the build. Confirm with your planning authority before placing the mobile home on site.

Can you get a mortgage on a mobile home?add

Generally no — mobile homes are normally bought with savings or caravan finance, because they are not property in the way a house is. A modular home on permanent foundations, with planning and building-control sign-off, is normally treated as a house; confirm with your lender early.

Sources

Where this page comes from

  • S.I. No. 340 of 2026 — Class 3A, condition 5: the structure "shall not be temporary in nature, such as a caravan or mobile home".
  • Planning and Development Regulations 2001, Schedule 2, Part 1, Class 8 — the exemption for keeping or storing a caravan, campervan or boat within the curtilage of a house.
  • Our planning permission guide for the full 2026 position, with its own sources.

General information, checked on 18 November 2026; not legal advice. Park rules, temporary permissions and lender policies vary; confirm yours with the park, your planning authority and your lender.

Next step

If it is going to be a home, start with the site

Send us the location and a few photos. We will tell you plainly whether a modular home looks like a notification or a planning application on your site, and what it costs — and if a mobile home is the more sensible answer for what you need, we will say that too.

More guides: Planning permission · What is a modular home? · Log cabin vs modular home